Introduction
In a multi-site and multi-format event environment, peaks in demand represent a major challenge. Anticipating these periods and maintaining ongoing operational responsiveness (7 days a week) are key success factors.
1. Nature of demand peaks
A demand peak is characterized by a sudden and significant increase in required resources (human, material, logistical) compared to the average.
In events, this can correspond to:
a product launch or a massive brand activation
a festival, a conference, or a trade show across multiple competing sites
simultaneous events in several locations requiring identical services
2. Anticipation and detection of weak signals
Analysis of historical data (seasonal fluctuations, types of recurring events): helping to model tense periods.
Implementation of "alert" scenarios: thresholds for triggering reinforcements, continuity plan.
Mapping of "buffer" skills: versatile technicians who can be redeployed.
3. Operational structuring 7 days a week
Maintaining a pool of mobilizable resources, active on call.
Forecasting external reinforcements (temporary workers, service providers) to absorb surpluses.
Establishing a continuous supervision and reporting system to detect deviations in real-time (overtime, incidents, delays).
Organizational flexibility to adjust teams, working hours, and rotations.
4. Recommended tools and processes
Use of load management and scheduling tools (by analogy to workload management): identification, allocation, monitoring.
"Quick update" processes for assignments based on field evolution.
Clear on-call protocols, defined crisis communications, backup equipment plan.
5. Impacts and benefits
Better coverage of events without degrading quality or overloading teams.
Mastery of costs related to overtime or last-minute reinforcements.
Increased reliability of technical service across all your sites.
Retention of field technicians thanks to better pre-planning and fewer unforeseen events.
Conclusion
For an organization like yours, the ability to absorb demand peaks while remaining responsive 7 days a week is a true differentiating factor. The key: anticipate, standardize, and redeploy effectively.
Blogs




